Summary
Highway Bridge Maintenance Planning and Scheduling provides new tactics for highway departments around the world that are faced with the dilemma of providing improved operations on a shoestring budget. Even after the much needed infrastructure funding is received, the question of which project comes first must be answered. Written by a 20-year veteran with the Kansas Department Of Transportation Bridge Office in design and in maintenance, this book provides Senior Bridge Maintenance Engineers with practical advice on how to create an effective maintenance program that will allow them to not only plan, schedule, direct, and monitor highway bridge repair and rehabilitation projects, but also evaluate all completed work for technical acceptability, productivity, and unit-cost standards. Provides the tools and methods for building, maintaining, planning, and scheduling effective maintenance Presents experience-based suggestions for evaluating highway bridges to determine maintenance priorities Includes methods for evaluating all completed work for technical acceptability, productivity, and unit-cost standards
Cataloging source
IDEBK
Index
no index present
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
Highway bridge maintenance planning and scheduling, Mark Hurt, Steven D. Schrock
Label
Highway bridge maintenance planning and scheduling, Mark Hurt, Steven D. Schrock
Link
Publication
Related Contributor
Related Location
Related Agents
Related Authorities
Related Subjects
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
cr
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
Machine generated contents note: 1.Introduction -- 1.1.Bridges in the United States -- 1.2.Bridge Preservation Process -- 1.3.Bridge Preservation Practices Before 1970 -- 1.4.Development of the National Bridge Inspection Standards -- 1.5.Ongoing Changes in Practice -- 1.5.1.Collapse of the I-35W Bridge -- 1.5.2.Preventing the Next Failure -- 1.5.3.Cost of Failure -- 1.6.Managing the Bridge Preservation Process -- 1.7.Scope and Purpose of the Text -- References -- 2.Bridge Elements and Materials -- 2.1.Classification of Bridge Structures -- 2.2.Buried Structures -- 2.3.Elements of Span Bridge Structures -- 2.3.1.Substructure Elements -- 2.3.2.Superstructure Types and Elements -- 2.4.Bridge Mechanics -- 2.4.1.Axial Forces -- Tension -- 2.4.2.Axial Forces -- Compression -- 2.4.3.Forces From Transverse Loading -- Bending -- 2.4.4.Transverse Loadings -- Shear -- 2.4.5.Fracture and Fatigue -- 2.5.Bridge Materials -- 2.5.1.Concrete and Reinforced Concrete -- 2.5.2.Prestressed Concrete -- 2.5.3.Steel -- 2.5.4.Timber -- 2.5.5.Other Materials -- References -- 3.Bridge Inspection and Evaluation -- 3.1.Introduction -- 3.2.Bridge Inspection in the United States -- 3.2.1.Types of Inspection -- 3.2.2.Component Condition Ratings -- 3.2.3.Appraisal Ratings -- 3.2.4.Deficiency and Sufficiency -- 3.2.5.Critical Findings -- 3.2.6.Element-Level Inspection -- 3.3.Bridge Inspections in Canada, Western Europe and South Africa -- 3.3.1.Canada -- 3.3.2.United Kingdom -- 3.3.3.South Africa -- 3.3.4.France -- 3.3.5.Germany -- 3.3.6.Finland -- 3.3.7.Observations -- 3.4.Reliability-Based Bridge Inspection -- 3.4.1.Risk-Based Assessment -- 3.4.2.Implementation in Indiana -- 3.5.Inspection Techniques and Technologies -- 3.5.1.Visual Inspections and Sounding -- 3.5.2.Nondestructive Testing -- Concrete -- 3.5.3.Nondestructive Testing -- Steel -- 3.5.4.Sampling -- 3.5.5.Inspecting Fiber-Reinforced Polymer -- 3.5.6.Posttensioning Ducts -- 3.5.7.Structural Health Monitoring -- 3.5.8.Sonar and Underwater Inspection -- 3.6.Load Rating -- 3.6.1.General Approach -- 3.6.2.Analysis Methodologies -- 3.6.3.Truck Loadings -- 3.6.4.Load Rating by Testing -- 3.6.5.Fatigue Evaluation of Steel Bridges -- 3.6.6.Programming Maintenance Actions -- References -- 4.Preventative Maintenance -- 4.1.Introduction -- 4.2.Cost Effectiveness -- 4.3.Maintenance Inspections -- 4.4.Bridge Decks and Expansion Joints -- 4.4.1.Deck Drainage -- 4.4.2.Deck Patching -- 4.4.3.Deck and Crack Sealing -- 4.4.4.Deck and Expansion Joint Washing -- 4.4.5.Timber Deck Preservation -- 4.5.Bridge Superstructure and Substructure -- 4.5.1.Washing Superstructures -- 4.5.2.Sealing Bearing Seats -- 4.5.3.Bearing Device Maintenance -- 4.5.4.Painting -- 4.6.Bridge Substructure and Waterway -- 4.7.Approaches and Roadways -- 4.7.1.Driver Guidance -- 4.7.2.Approach Settlement -- 4.7.3.Relief Joints -- 4.8.Recommendations -- References -- 5.Substantial Maintenance and Rehabilitation -- 5.1.Introduction -- 5.2.Assessment and Scoping -- 5.2.1.Closing or Removing Bridges -- 5.2.2.Level of Repair -- 5.2.3.Design Codes and Specifications -- 5.3.Repair Methods -- 5.3.1.Concrete -- 5.3.2.Steel -- 5.4.Substantial Maintenance Actions -- 5.4.1.Decks and Railing -- 5.4.2.Expansion Joints -- 5.4.3.Bearing Devices -- 5.4.4.Steel Superstructure -- 5.4.5.Painting Steel Structures -- 5.4.6.Reinforced Concrete Superstructure -- 5.4.7.Prestressed Concrete Superstructure -- 5.4.8.Posttensioned Concrete Superstructure -- 5.4.9.Piers and Pier Bents -- 5.4.10.Abutments -- 5.4.11.Culverts -- 5.5.Rehabilitation Actions -- 5.5.1.Deck Replacement -- 5.5.2.Superstructure Replacement -- 5.5.3.Bridge Widening -- References -- 6.Bridge Life Cycle Costing -- 6.1.Project Scoping and Selection -- 6.1.1.Initial Selection -- 6.1.2.Adjusting Scope -- 6.2.Bridge Life Cycle Cost Analysis -- 6.2.1.Inflation -- 6.2.2.Discount Rate -- 6.2.3.Cash Flow Diagrams -- 6.2.4.Residual Value -- 6.3.Determining Costs -- 6.3.1.Agency Costs -- 6.3.2.User Costs -- 6.3.3.Vulnerability Costs -- 6.3.4.Economic Costs -- 6.4.Deterioration Rates -- 6.5.Applying Bridge Life Cycle Costing -- 6.5.1.BLCCA Programs -- 6.5.2.Typical Applications of BLCCA -- References -- 7.Bridge Management -- 7.1.Contemporary History of Bridge Management -- 7.1.1.Before the NBIS -- 7.1.2.Definition of Bridge Management -- 7.1.3.Level of Service -- 7.1.4.BMS Software -- 7.1.5.Asset Management -- 7.2.Project and Program Selection -- 7.2.1.Priority Ranking -- 7.2.2.Programming Maintenance Work -- 7.2.3.Priority Indexing -- 7.3.Experiences from the Kansas Department of Transportation -- 7.3.1.Commitment to Bridge Preservation -- 7.3.2.Coordination Between Bridge Inspection and Design -- References
http://library.link/vocab/cover_art
https://contentcafe2.btol.com/ContentCafe/Jacket.aspx?Return=1&Type=S&Value=9780128020845&userID=ebsco-test&password=ebsco-test
Dimensions
unknown
http://library.link/vocab/discovery_link
{'f': 'http://opac.lib.rpi.edu/record=b3869060'}
Extent
1 online resource
Form of item
online
Isbn
9780128020845
Media category
computer
Media MARC source
rdamedia
Media type code
c
Specific material designation
remote

Library Locations

    • Folsom LibraryBorrow it
      110 8th St, Troy, NY, 12180, US
      42.729766 -73.682577
Processing Feedback ...